Project Description:
AMHERST- HADLEY- RESURFACING AND RELATED WORK ON ROUTE 116
The work to be done under this contract consists of resurfacing a section of Route 116 in the towns of Amherst and Hadley. The work begins at the intersection of Route 9/Route 116 at mile marker 20.5 and continues north to the intersection of Meadow Street/Route 116 at mile marker 23.7. The work consists of milling the existing pavement and resurfacing with hot mix asphalt. This section of Route 116 is a limited access highway. In addition to pavement resurfacing the work will include re-alignment of the off ramp from Route 116 southbound to Route 9 westbound. The purpose of the re-alignment is to improve pedestrian and bicycle crossings at the intersection by eliminating the high-speed acceleration lane and replacing it with a more perpendicular intersection with stop condition or low speed yield control. The work also includes replacement of pavement markings, adjusting and rebuilding drainage structures, excavation of built-up sediment along shoulders to restore country drainage, replacement of guardrail end treatments, placement of pavement millings to fill low shoulders, traffic controls, and other incidental items as necessary.
Location:
  • Town of Amherst
  • Town of Hadley
  • Construction Begins: Spring 2024
    Resident Engineer: Peng Xu
    Construction Bid Price: $4,639,182.00
    District: District 2

    Contracts (1) Progress
    # 125513 -- Construction Contract
    Resurfacing and Related Work on Route 116

    Bridges

    Contract Dates
    Notice to Proceed: 05/03/2024
    Contract Information
    Project Designer: In-House Boston
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/07/2023
    Project Need Form PNF Approved 03/06/2023
    Project Initiation Form PIF Entered 03/07/2023
    Project Initiation Form PIF Approved 03/06/2023
    Project Initiation Form PRC Submitted 03/30/2023
    Project Review Committee PRC Approved 04/21/2023
    Project Status Advertised 03/16/2024
    Project Management
    100% Design 100% Package Received 12/21/2023
    25% Design 25% Package Received 10/11/2023
    75% Design 75% Package Received 10/11/2023
    75% Design 75% Package Comments to DE 11/15/2023
    Final Design PS&E Received 12/21/2023
    Final Design PS&E Received - Resub 1 01/29/2024