| Project Description: |
LAWRENCE- BRIDGE PRESERVATION, L-04-035 (2XD & 2X6) I-495 & ACCESS RAMPS OVER THE MERRIMACK RIVER
This project will repair the substructures for the bridges carrying I-495 and access ramps over the Merrimack River.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $12,571,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||