| Project Description: |
GARDNER- SHARED-USE PATH CONSTRUCTION, NORTH CENTRAL PATHWAY EXTENSION
The project includes development of a 10-foot wide paved shared use path, with two-foot gravel shoulders, beginning on the former railbed near its intersection with Jackson Street, and continuing approximately 1.6 miles north to Green Street / Route 140.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Joseph Gyujong Yoo![]() |
| Estimated Total Contract Cost: | $4,680,000.00 |
| Estimated Total Federal Participating Construction Cost: | $5,070,000.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||