Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
TYNGSBOROUGH- CULVERT REPLACEMENT ON WESTFORD ROAD
The project proposes to replace the heavily deteriorated corrugated metal pipe culvert carrying Westford Road over Bridge Meadow Brook. It is anticipated that the proposed structure will be a 3-sided precast concrete culvert supported on spread footings with adjacent concrete wingwalls at all four corners. There are two subsurface gas lines and a subsurface water main that pass above the existing structure; it is expected that all of these utilities will need to be permanently relocated as part of this project. There will be upgrades to the bridge railing and approach traffic safety features as part of the project in order to bring them up to current standards. The project limits include the existing culvert carrying Westford Road over Bridge Meadow Brook and its approaches, totaling approximately 150 feet. The project includes reconstruction of Westford Road to provide 11' lanes and 1' shoulders, new guardrail, and new drainage structures. There are no existing pedestrian accommodations in or adjacent to the project limits. The project will provide accommodations for future sidewalk construction on the north side of the road by installing guardrail 5' minimum from the edge of road and constructing granite curbing and gravel base for potential future sidewalk.
Location:
  • Town of Tyngsborough
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Adetoyin Ayoola Olaoye
    Estimated Total Contract Cost: $1,783,034.25
    Estimated Total Federal Participating Construction Cost: $1,950,455.95
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/20/2023
    Project Need Form PNF Approved 04/05/2023
    Project Initiation Form PIF Entered 04/20/2023
    Project Initiation Form PIF Approved 04/20/2023
    Project Initiation Form PRC Submitted 04/24/2023
    Project Review Committee PRC Approved 06/01/2023
    Project Management