Project Description: |
SANDWICH- SHARED-USE PATH CONSTRUCTION, FROM ROUTE 130 AT SHAWME ROAD TO FREEZER ROAD TO CANAL SERVICE ROAD
Work on this project will include the construction of a 3.1 mile shared use path in Sandwich from Route 130 (Water Street), along Morse Road, through the fish hatchery property, along Route 6A to Tupper Road and connecting on Freezer Road with the existing Cape Cod Canal Service Road (Bike path).
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Michael O'Dowd |
Estimated Total Contract Cost: | $20,476,000.00 |
Estimated Total Federal Participating Construction Cost: | $22,065,900.00 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|