| Project Description: |
ATTLEBORO- NORTH ATTLEBORO- SYSTEMATIC BRIDGE PRESERVATION AT 5 BRIDGES ALONG THE I-95 CORRIDOR
The project is a bridge preservation job addressing bridges in the I-95 corridor. The five bridges to be repaired will be in the towns of Attleboro and North Attleboro. A combination of deck, superstructure, and substructure repairs will be conducted to restore the bridges to a state of good repair.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2028 |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $8,484,800.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||