| Project Description: |
FOXBORO- BRIDGE PRESERVATION AT 6 BRIDGES ALONG THE I-95 CORRIDOR
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $5,097,416.78 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | 75% Package Received (as of 01/23/2026 ) |
|
Bridges
|
||||||
|
|
|
|||||||||||||||||||||||||||||