Project Description: |
READING- WILMINGTON- BRIDGE PRESERVATION, W-38-028 (2HR, 2HT) AND R-03-011 (2HK), I-93 (NB/SB) OVER MBTA/B&M RAILROAD AND I-95/STATE ROUTE 128
This project will do preservation of the deck, superstructure, and substructure of the bridges carrying I-93 (NB/SB) over the MBTA railroad and I-95/Route 128.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2028 |
Project Manager: | Genesis Poz Diaz |
Estimated Total Contract Cost: | $15,525,000.00 |
Estimated Total Federal Participating Construction Cost: | $16,100,000.00 |
Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|