Project Description: |
SHREWSBURY- BRIDGE REPLACEMENT, S-14-009 (B74), CENTECH BOULEVARD OVER PRATTS POND INLET
This project will consist of a full bridge replacement at the Centech Boulevard bridge over the Pratts Pond Inlet in the town of Shrewsbury. Spandrel wall patching may also be performed.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Jonathan E Freeman |
Estimated Total Contract Cost: | $3,008,745.00 |
Estimated Total Federal Participating Construction Cost: | $3,231,615.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|