| Project Description: |
SHREWSBURY- BRIDGE REPLACEMENT, S-14-009 (B74), CENTECH BOULEVARD OVER PRATTS POND INLET
This project will consist of a full bridge replacement at the Centech Boulevard bridge over the Pratts Pond Inlet in the town of Shrewsbury. Spandrel wall patching may also be performed.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Jonathan E Freeman![]() |
| Estimated Total Contract Cost: | $3,008,745.00 |
| Estimated Total Federal Participating Construction Cost: | $3,231,615.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|