Project Description: |
PALMER- BRIDGE REPLACEMENT, P-01-015 (17A), MAIN STREET OVER WARE RIVER
This project will consist of a full bridge replacement at the Main Street bridge over the Ware River in the Town of Palmer. Portions of the substructure will be evaluated for potential rehab/reuse.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Construction Begins: | Autumn 2029 |
Project Manager: | Shahpar Negah |
Estimated Total Contract Cost: | $9,256,882.50 |
Estimated Total Federal Participating Construction Cost: | $9,599,730.00 |
Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|