| Project Description: |
PALMER- BRIDGE REPLACEMENT, P-01-015 (17A), MAIN STREET OVER WARE RIVER
This project will consist of a full bridge replacement at the Main Street bridge over the Ware River in the Town of Palmer. Portions of the substructure will be evaluated for potential rehab/reuse.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Shahpar Negah![]() |
| Estimated Total Contract Cost: | $9,256,882.50 |
| Estimated Total Federal Participating Construction Cost: | $9,599,730.00 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|