| Project Description: |
EAST BRIDGEWATER- BRIDGE REPLACEMENT, E-01-010 (BVT) POND STREET OVER SATUCKET RIVER
This project will consist of a full bridge replacement at the Pond Street culvert bridge over the Satucket River, in the town of East Bridgewater.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Herrio Lamothe![]() |
| Estimated Total Contract Cost: | $1,077,502.50 |
| Estimated Total Federal Participating Construction Cost: | $1,197,225.00 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|