Project Description: |
GLOUCESTER- BRIDGE REHABILITATION, G-05-015 (326), CENTENNIAL AVE OVER MBTA
This project will consist of bridge rehabilitation at the Centennial Ave bridge over the MBTA railroad in Gloucester. The timber superstructure will be replaced and the bridge substructure will be rehabilitated.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Joseph Gyujong Yoo |
Estimated Total Contract Cost: | $2,484,337.50 |
Estimated Total Federal Participating Construction Cost: | $2,668,362.50 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|