Project Description: |
ORANGE- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON EAST MAIN STREET (ROUTE 2A)
The project proposes bicycle and pedestrian improvements along the Route 2A in Orange from Whitney Street and E Main Street.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Adam W Kiel |
Estimated Total Contract Cost: | $4,117,906.19 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|