Project Description:
HOLYOKE- EASTHAMPTON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-91
The work to be done consists of resurfacing Interstate 91 in Holyoke and Easthampton and includes the bridges over Country Club Road, Reservation Road, Route 141 EB and WB, Bemis Road and East Street. The project extends from mile marker 14.9 in Holyoke to mile marker 21.0 in Easthampton, totaling 6.1 miles. The work also includes bridge deck re habilitation and resurfacing, replacement and repair of bridge joints, removing and replacing existing pedestrian curb ramps, proposed sidewalk and pedestrian curb ramps, excavation of accumulated sediment on roadway shoulders to restore country drainage, adjusting and/or rebuilding drainage structures, cleaning paved waterways, replacing or repairing guardrail, installation of recessed pavement markings and slotted pavement markers, implementing temporary traffic controls, and other incidental items.
Location:
  • Town of Easthampton
  • City of Holyoke
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2028
    Project Manager: Koby J Lemrise
    Estimated Total Contract Cost: $13,269,441.45
    Estimated Total Federal Participating Construction Cost: $13,540,774.93
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization.
    District: District 2
    Current Status: 75% Package Comments to DE (as of 09/17/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Pioneer Valley Metropolitan Planning Organization
    Location: Municipality
    Cities: EASTHAMPTON
    HOLYOKE
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Hwy Perform. Prgm (NHPP) - Interstate Maintenance
    Federal Cost: $12,728,016.00
    State Cost: $1,414,224.00
    Total Cost: $14,142,240.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/25/2023
    Project Need Form PNF Approved 04/25/2023
    Project Initiation Form PIF Entered 04/25/2023
    Project Initiation Form PIF Approved 04/25/2023
    Project Initiation Form PRC Submitted 05/24/2023
    Project Review Committee PRC Approved 06/01/2023
    Project Management
    25% Design 25% Package Received 08/12/2024
    75% Design 75% Package Received 08/12/2024
    75% Design 75% Package Comments to DE 09/17/2024