| Project Description: |
SUDBURY- FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST
The proposed project consists of extending the Bruce Freeman Rail Trail (BFRT) approximately 1.3 miles from the existing terminus at the Sudbury Diamond Railroad Crossing to Eaton Road W in Framingham. The proposed trail will be a 10 foot paved shared-use path along the former railroad corridor with 2 foot dense graded crushed stone shoulders, consistent with the other portions of the BFRT in Sudbury and Concrod. Sidewalks and pedestrian curb ramps at the at-grade intersection of the trail and Route 20 are proposed to be updated to create an ADA compliant and accessible crossing at the existing signalized intersection of Nobscot Rd/Route 20. A new paved parking lot is also being proposed along Nobscot Road, approximately 550 feet south of Route 20. Other work includes fixing or replacing culverts and stream crossings where necessary and implementing safety fencing along the trail where appropriate.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Spring 2029 |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $7,409,914.65 |
| Estimated Total Federal Participating Construction Cost: | $7,704,022.60 |
| Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 3 |
| Current Status: | Design Public Hearing (as of 05/15/2025 ) |
|