| Project Description: |
SOMERVILLE- HIGHWAY LIGHTING UPGRADES TO MCGRATH HIGHWAY
Repair and upgrade to the lighting along the McGrath Highway in Somerville
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ranjit Sivasubramaniam![]() |
| Estimated Total Contract Cost: | $0.00 |
| Estimated Total Federal Participating Construction Cost: | $11,552,338.72 |
| District: | District 4 |
| Current Status: | 25% Package Received (as of 01/25/2024 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||