Project Description:
FOXBOROUGH- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95
The southerly project limit begins at the pavement joint around mile marker 13.6± in Foxborough and proceeds north to the pavement joint near mile marker 16.3± in Foxborough. The work to be carried out during the duration of this contract shall consist of 1.75” depth pavement fine milling to remove existing 1” depth Open Graded Friction Course, and resurfacing with a 1.75” Superpave High Performance Surface Course (HP-12.5) for the I-95 mainline. Additional work connected with this contract will include cleaning, repairing, and adjusting existing drainage structures; replacing end treatments to bring them up to MASH compliancy and spot-repairing guardrail and replacing metal guardrail blocks as directed by the Resident Engineer, as well as the reinstallation of pavement markings/ markers.
Location:
  • Town of Foxborough
  • Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2027
    Project Manager: Eric I Nova
    Estimated Total Contract Cost: $9,616,973.00
    Estimated Total Federal Participating Construction Cost: $9,845,148.25
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 5
    Current Status: PS&E Received (as of 11/17/2026 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: FOXBOROUGH
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Hwy Perform. Prgm (NHPP) - Interstate Maintenance
    Federal Cost: $7,230,717.00
    State Cost: $803,413.00
    Total Cost: $8,034,130.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/10/2023
    Project Need Form PNF Approved 05/10/2023
    Project Initiation Form PIF Entered 05/10/2023
    Project Initiation Form PIF Approved 05/10/2023
    Project Initiation Form PRC Submitted 05/24/2023
    Project Review Committee PRC Approved 06/01/2023
    Project Management
    100% Design 100% Package Received 08/17/2026
    75% Design 75% Package Received 08/17/2026
    Final Design PS&E Received 11/17/2026