Project Description:
SOUTHAMPTON- WILLIAM E. NORRIS ELEMENTARY SCHOOL IMPROVEMENTS (SRTS)
The purpose of this project is to provide traffic safety and pedestrian improvements to encourage safe walking and biking for students and drivers in a 0.42 mile stretch of Pomeroy Meadow Road where the William E. Norris School is located. The project includes full-depth reconstruction of an existing 4' asphalt sidewalk along a 2,200 foot portion of Pomeroy Meadow Rd (east side): replace with a 10' wide shared use ADA compliant path, with 2' grass strip and vertical granite curbing along roadway, two new crosswalks with ADA compliant Pedestrian Curb Ramps (PCR's) at Courtney and Parsons Lanes with two rapid rectangular flashing beacons, new 5' wide sidewalk (west side) to fill gaps for providing better pedestrian connectivity, and upgrade of existing crosswalk at Gunn Road.
Location:
  • Town of Southampton
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Construction Begins: Summer 2027
    Project Manager: Linda Walsh
    Estimated Total Contract Cost: $1,745,545.80
    Estimated Total Federal Participating Construction Cost: $1,907,376.24
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/30/2023
    Project Need Form PNF Approved 05/12/2023
    Project Initiation Form PIF Entered 05/30/2023
    Project Initiation Form PIF Approved 05/25/2023
    Project Initiation Form PRC Submitted 07/13/2023
    Project Review Committee PRC Approved 07/13/2023