Project Description: |
NORTHAMPTON- HVAC REPAIRS TO DISTRICT ADMINSTRATION BUILDING AT 811 NORTH KING STREET
Project consists of evaluating and Repairing/Replacing elements of heating and cooling system.(PTAC units)
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2025 |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $1,725,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
Current Status: | This project is in the preliminary design phase. |
|