| Project Description: |
NORTHAMPTON- HVAC REPAIRS TO DISTRICT ADMINSTRATION BUILDING AT 811 NORTH KING STREET
Project consists of evaluating and Repairing/Replacing elements of heating and cooling system.(PTAC units)
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Edmond Libsch![]() |
| Estimated Total Contract Cost: | $1,725,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||