Project Description: |
WESTFIELD- ROOF REPLACEMENT AT MASSDOT FACILITY AT I-90 AND SGT THOMAS DIONE WAY
Project consists of removing failed existing tar and stone roof system with new PVC membrane and insulation.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2025 |
Project Manager: | Ancarlos M Youssef |
Estimated Total Contract Cost: | $391,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
Current Status: | 100% Package Received (as of 10/28/2024 ) |
|
Bridges |
|
|
|