Project Description: |
BOSTON- BRIDGE PRESERVATION, B-16-234 (BKV), RICHMOND STREET OVER STATE ROUTE 1A
This project will consist of bridge preservation items at the Richmond Street bridge over State Route 1A Northbound, in the city of Boston. This includes repaving, repairing abutment cracks, repairing beams and lighting, and replacing sidewalks.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $496,074.55 |
Estimated Total Federal Participating Construction Cost: | $562,240.63 |
District: | District 6 |
Current Status: | 100% Package Comments to DE (as of 11/21/2023 ) |
|