Project Description: |
PEABODY- SCHEDULED BRIDGE MAINTENANCE REPAIRS ON P-03-036 (2VX & 2VW)
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2024/2025 |
Project Manager: | Genesis Poz Diaz |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | 75% Package Received (as of 04/01/2024 ) |
|
Bridges |
|
|
|