| Project Description: |
HOLLISTON- LINDEN STREET IMPROVEMENTS AT ROBERT ADAMS MIDDLE SCHOOL (SRTS)
The project includes installing new and reconstructing existing sidewalks along Linden Street adding a new crosswalk constructing ADA accessible ramps and installing a pedestrian warning flasher assembly at Linden Street around Grove Street and Avon Street.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Summer 2028 |
| Project Manager: | Yaseen Al Abdullah![]() |
| Estimated Total Contract Cost: | $843,750.00 |
| Estimated Total Federal Participating Construction Cost: | $937,500.00 |
| Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|