BECKET- BRIDGE PRESERVATION, B-03-052 (0DA), HIGH STREET OVER WESTFIELD RIVER, CSX TRACKS, AND PLEASANT STREET
This project will consist of multiple bridge preservation efforts at the High Street bridge over the Westfield River, in the town of Becket. The proposed work includes repaving, repairs to steel & concrete, cleaning & painting, and sidewalk replacement.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alolade O Campbell |
Estimated Total Contract Cost: | $4,914,000.00 |
Estimated Total Federal Participating Construction Cost: | $5,278,000.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|