Project Description: |
CONWAY- SHELBURNE- BRIDGE PRESERVATION AND SUPERSTRUCTURE REPLACEMENT, C-20-017=S-11-002 (0H6), BARDWELLS FERRY ROAD OVER DEERFIELD RIVER
This project will consist of deck/joint repairs, cleaning & painting, and guardrail updates at the Bardwells Ferry Road bridge over the the Deerfield River, in the towns of Conway and Shelburne.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gregory Mischel |
Estimated Total Contract Cost: | $5,859,000.00 |
Estimated Total Federal Participating Construction Cost: | $6,293,000.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|