Project Description: |
GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-008 (04K), BROOKSIDE ROAD OVER HOUSATONIC RIVER
This project will consist of bridge replacement at the Brookside Road bridge over the Housatonic River in the town of Great Barrington. The proposed work includes stringer & abutment replacements, steel repairs, deck & joint improvements, paving, and cleaning & painting.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Dongke Yu |
Estimated Total Contract Cost: | $10,883,200.00 |
Estimated Total Federal Participating Construction Cost: | $11,582,160.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|