Project Description: |
GREAT BARRINGTON- BRIDGE PRESERVATION, G-11-008 (04K), BROOKSIDE ROAD OVER HOUSATONIC RIVER
This project will consist of bridge preservation improvements at the Brookside Road bridge over the Housatonic River, in the town of Great Barrington. The proposed work includes stringer & abutment replacements, steel repairs, deck & joint improvements, paving, and cleaning & painting.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $3,375,000.00 |
Estimated Total Federal Participating Construction Cost: | $3,625,000.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|