| Project Description: |
PALMER- DECK REPLACEMENT, P-01-050 (4MF) & P-01-051 (4MG), I-90 EXIT 63 RAMPS OVER I-90 AND SHEARER STREET
This project will consist of bridge deck replacement, cleaning & painting of structural steel, and bearing repair/replacement at two bridges in the town of Palmer. The bridges carry the I-90 Exit 8 ramps over I-90 and Shearer Street.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2028 |
| Project Manager: | Ryan P. Wilcox![]() |
| Estimated Total Contract Cost: | $7,980,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||