| Project Description: |
DEERFIELD- CULVERT REPLACEMENT ON ROUTE 10 BY INTERSECTION OF WAPPING ROAD/DEPOT ROAD AND ROUTE 10
The project aims to replace an undersized culvert on Route 10 that is causing erosion of the side slope and flooding of the roadway.
|
| Location: |
|
| Project Manager: | Adetoyin Ayoola Olaoye![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|