Project Description: |
CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR
The purpose of this project is to construct a new bridge carrying a shared use path over the MBTA Fitchburg Line between New Street and Sherman Street, connecting residential neighborhoods with the existing and future shared use path network at New Street, Alewife Brook Parkway, and Danehy Park.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Michael O'Dowd |
Estimated Total Contract Cost: | $15,225,000.00 |
Estimated Total Federal Participating Construction Cost: | $15,722,875.00 |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|