| Project Description: |
PALMER- DECK REPLACEMENT, P-01-053 (4MC), BRECKENRIDGE STREET OVER I-90
This project will consist of bridge preservation work at the Breckenridge Street bridge over I-90 in the town of Palmer. The work proposed is deck replacement, bearing repair/replacement, and cleaning & painting of structural steel.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ryan P. Wilcox![]() |
| Estimated Total Contract Cost: | $3,780,000.00 |
| Estimated Total Federal Participating Construction Cost: | $4,060,000.00 |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|