Project Description: |
PALMER- CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS ALONG ROUTE 20 AND ROUTE 32
This project aims to replace structurally deteriorated undersize culverts along Route 20 and Route 32. The replacements will help alleviate the flooding and erosion of the side slope of the roadways.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2029 |
Project Manager: | Ryan P. Wilcox |
Estimated Total Contract Cost: | $4,785,000.00 |
Estimated Total Federal Participating Construction Cost: | $5,211,200.00 |
Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|