Project Description: |
WORCESTER- BRIDGE REPLACEMENT, W-44-063 (1LA), ROUTE 122 (GRAFTON STREET) OVER ROUTE 20
This project consists of bridge replacement for the Route 122/Grafton Street bridge over Route 20 in the city of Worcester. In addition to superstructure and substructure replacement, the Route 122 bridge approaches will be reconstructed as needed. Furthermore, the project also means to increase the vertical clearance to 5 meters.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Jacob Tanoglu |
Estimated Total Contract Cost: | $23,247,000.00 |
Estimated Total Federal Participating Construction Cost: | $24,108,000.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|