| Project Description: |
WESTMINSTER- ROUNDABOUT CONSTRUCTION ON ROUTE 2A AT BATHRICK ROAD AND DEPOT ROAD
The proposed project consists of replacing the existing two-way stop-controlled intersection with a roundabout The proposed lane configurations proposes to maintain the existing single-lane approaches and install a shared-use path along the north side of the intersection to provide connections with
businesses adjacent to the intersection and Bathrick Road to Theodore Drive.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2030 |
| Project Manager: | Alolade O Campbell![]() |
| Estimated Total Contract Cost: | $3,640,972.35 |
| Estimated Total Federal Participating Construction Cost: | $3,961,562.15 |
| Funding Provision: | This project is planned to be funded through the 2030 Transportation Improvement Program for the Montachusett Metropolitan Planning Organization. |
| District: | District 3 |
| Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 10/07/2024 ) |
|
Bridges |
||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||