WESTMINSTER- ROUNDABOUT CONSTRUCTION ON ROUTE 2A AT BATHRICK ROAD AND DEPOT ROAD
The proposed project consists of replacing the existing two-way stop-controlled intersection with a roundabout The proposed lane configurations proposes to maintain the existing single-lane approaches and install a shared-use path along the north side of the intersection to provide connections with businesses adjacent to the intersection and Bathrick Road to Theodore Drive.
Location:
  • Town of Westminster
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Alolade O Campbell
    Estimated Total Contract Cost: $3,640,972.35
    Estimated Total Federal Participating Construction Cost: $3,961,562.15
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/18/2023
    Project Need Form PNF Approved 08/29/2023
    Project Initiation Form PIF Entered 09/18/2023
    Project Initiation Form PIF Approved 09/18/2023
    Project Initiation Form PRC Submitted 09/18/2023
    Project Review Committee PRC Approved 10/12/2023
    Project Management