Project Description: |
WESTMINSTER- ROUNDABOUT CONSTRUCTION ON ROUTE 2A AT BATHRICK ROAD AND DEPOT ROAD
The proposed project consists of replacing the existing two-way stop-controlled intersection with a roundabout The proposed lane configurations proposes to maintain the existing single-lane approaches and install a shared-use path along the north side of the intersection to provide connections with
businesses adjacent to the intersection and Bathrick Road to Theodore Drive.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alolade O Campbell |
Estimated Total Contract Cost: | $3,640,972.35 |
Estimated Total Federal Participating Construction Cost: | $3,961,562.15 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|