| Project Description: |
LAWRENCE- BRIDGE REPLACEMENT, L-04-004 (2PX), UNION STREET OVER NORTH CANAL
This project consists of a full bridge replacement with widening at the Union Street bridge over the North Canal, in the town of Sheffield.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Harry Adolphe![]() |
| Estimated Total Contract Cost: | $8,177,673.60 |
| Estimated Total Federal Participating Construction Cost: | $8,480,550.40 |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|