Project Description: |
LAWRENCE- BRIDGE REPLACEMENT, L-04-004 (2PX), UNION STREET OVER NORTH CANAL
This project consists of a full bridge replacement with widening at the Union Street bridge over the North Canal, in the town of Sheffield.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Harry Adolphe |
Estimated Total Contract Cost: | $8,177,625.00 |
Estimated Total Federal Participating Construction Cost: | $8,480,500.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|