| Project Description: |
SHEFFIELD- SUPERSTRUCTURE REPLACEMENT, S-10-013 (087), KELLOGG ROAD OVER HOUSATONIC RIVER
This project will consist of a bridge reconstruction/rehabilitation work at the Kellogg Road bridge over the Housatonic River, in the town of Sheffield. The bridge is currently planned for a superstructure replacement and substructure preservation/rehabilitation as needed.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Greg Frazier![]() |
| Estimated Total Contract Cost: | $8,007,989.05 |
| Estimated Total Federal Participating Construction Cost: | $8,497,629.20 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|