| Project Description: |
DISTRICT 5- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS
MassDOT’s Vulnerable Road User (VRU) Assessment found that a disproportional amount of pedestrian and bicyclist fatal or serious injury crashes occurred within 300 feet of a bus stop. In an effort to address this, MassDOT is investing Highway Safety Improvement Program (HSIP) funds into crossing improvements at bus stops throughout the state in a multi-year approach. Bus stops that were identified as high risk for pedestrians or had a high potential for people walking within 300 feet of them were prioritized for these improvements. Project elements include adding pedestrian refuge islands, installing flashing warning signs (RRFBs) or other signs, painting high-visibility crosswalks, curb extensions, etc. Locations are currently identified in the following locations and subject to change: Bourne, Brockton, Edgartown, Falmouth, Tisbury, and West Tisbury.
|
| Location: |
|
| Construction Begins: | Spring 2025 |
| Resident Engineer: | Alfredo Nunez![]() |
| Construction Bid Price: | $1,454,684.70 |
| District: | District 5 |
| Current Status: | • Advanced warning signs were installed for Bourne and Falmouth locations on 9/23 & 9/24/25. • Tree protection was installed in Falmouth on 10/3/25. • Sawcutting roadway was done in Bourne on 10/6/25. • Erosion control and tree trimming was finished in Bourne on 10/14/25. • All locations in Martha’s Vineyard have been finished. Preliminary Punch List for these locations was sent to the Contractor on 8/28/26. • Location in Falmouth has received new plans and started on 5/4/26, mostly complete as of 5/20/26. • Locations in Brockton began on 6/9/26 at N. Pearl Street. • Unclassified excavation and gravel borrow for sidewalks started in Brockton the week of 7/7/26. Work on hold currently due to potential conflicts at the 3 locations. Location at Cashman St. intersection has been directed to be returned to its original condition, as it has been eliminated from scope. • Locations in Bourne were finished on 8/31/26. Normal work hours are Monday through Friday, 7:00 AM to 3:30 PM (as of 09/14/2026) |
|
Bridges |
||||||||
|
||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||