| Project Description: |
BOSTON- BRIDGE REPLACEMENT, B-16-207 (3GT), W THIRD STREET OVER HAUL ROAD & CSX
This project will consist of a bridge replacement at the W Third Street bridge over Haul Road and the CSX railroad, in the City of Boston.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Kathy Dougherty![]() |
| Estimated Total Contract Cost: | $8,756,100.00 |
| Estimated Total Federal Participating Construction Cost: | $9,080,400.00 |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||||
|
|
|
||||||||||||||||||||||||||