Project Description: |
BOSTON- TUNNEL PRESERVATION, REPLACEMENT OF SIDEWALL DUCT ACCESS DOORS AT MHS TUNNELS
The work under this project will consist of replacing sidewall duct access doors within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2027 |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $2,800,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|