Project Description: |
BOSTON- TUNNEL PRESERVATION, REPLACEMENT OF PLENUM AND ACCESS DUCT LIGHTING AT MHS TUNNELS
The work under this project will consist of replacing plenum and access duct lighting within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $14,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|