| Project Description: |
BOSTON- TUNNEL PRESERVATION, PLENUM AND DUCT CLEANING AT MHS TUNNELS
The work under this project will consist of cleaning plenums and ducts within the MHS tunnel system on a priority basis.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Contract Cost: | $1,400,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|