Project Description:
BOSTON- TUNNEL PRESERVATION, INSTALLATION AND REPLACEMENT OF SUMP PUMPS AT MHS TUNNELS
The work under this project will consist of the installation and replacement of sump pumps within the MHS tunnel system on a priority basis.
Location:
  • City of Boston
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Hema P Bhatt
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project