Project Description: |
BOSTON- TUNNEL PRESERVATION, INSTALLATION AND REPLACEMENT OF SUMP PUMPS AT MHS TUNNELS
The work under this project will consist of the installation and replacement of sump pumps within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2025/2026 |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $4,200,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|