Project Description: |
BOSTON- TUNNEL PRESERVATION, VENT BUILDING INTERIOR CONCRETE REPAIR WORK AT MHS TUNNELS
The work under this project will consist of repair of deteriorated vent building interior concrete within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2027 |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $7,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|