Project Description: |
BOSTON- TUNNEL PRESERVATION, REPLACEMENT OF TUNNEL CROSS-PASSAGES, UTILITY ROOMS, AND MISCELLANEOUS DOORS AT MHS TUNNELS
The work under this project will consist of replacement of cross passage utility room and misc doors within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $4,200,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|