Project Description: |
BOSTON- TUNNEL PRESERVATION, OVERHEAD CONCRETE REPAIRS AT MHS TUNNELS
The work under this project will consist of repairing deteriorated overhead concrete within the MHS tunnel system on a priority basis.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $5,758,447.50 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | 25% Package Received (as of 05/03/2024 ) |
|