Project Description: |
BOSTON- TUNNEL PRESERVATION, CENTRIFUGAL FAN REFURBISHMENT IN MHS TUNNELS
The work under this project will consist of rehabilitation of existing centrifugal fans which are part of the tunnel ventilation systems The fans have been in service for over 20 years.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $210,000,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|