| Project Description: |
BOSTON- SUMNER TUNNEL VENTILATION BUILDINGS BRICK FACADE REPLACEMENT
The work under this project consists of the replacement of the Sumner Tunnel vent buildings brick façade replacement.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Contract Cost: | $21,000,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||