Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003=T-01-004 (3M4), SOUTH STREET EAST OVER THE TAUNTON RIVER
The proposed project consists of replacing the bridge deck, increasing safety, and improving operations of the roadway. The proposed design relocates the existing bridge sidewalk from the east to the west side of the bridge to connect to an existing sidewalk on the southwest approach. A 5-foot shoulder for a bike lane in the northbound direction improves safety by providing dedicated space for cyclists, separating them from vehicular traffic. This separation reduces the risk of conflicts between cyclists and vehicles.
Location:
  • Town of Raynham
  • City of Taunton
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Autumn 2026
    Project Manager: Herrio Lamothe
    Estimated Total Contract Cost: $6,913,567.34
    Estimated Total Federal Participating Construction Cost: $6,269,240.00
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization.
    District: District 5
    Current Status: Design Public Hearing (as of 07/30/2025 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: RAYNHAM
    TAUNTON
    Category: Advertised Projects Constr.
    Budget Section: 1B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - High Priority Projects (HPP) 1
    Federal Cost: $5,000,000.00
    State Cost: $1,250,000.00
    Total Cost: $6,250,000.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/17/2023
    Project Need Form PNF Approved 09/13/2023
    Project Initiation Form PIF Entered 11/17/2023
    Project Initiation Form PIF Approved 11/17/2023
    Project Initiation Form PRC Submitted 11/21/2023
    Project Review Committee PRC Approved 12/14/2023
    Project Management
    25% Design 25% Package Received 03/10/2025
    25% Design Design Public Hearing 07/30/2025