Project Description: |
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-003=T-01-004 (3M4), SOUTH STREET EAST OVER THE TAUNTON RIVER
The proposed project consists of replacing the bridge deck, increasing safety, and improving operations of the roadway. Significant widening of the bridge is not part of this project, however a 5-foot bike lane on both sides of the bridge will be considered to facilitate pedestrian and bicyclist access.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Construction Begins: | Autumn 2026 |
Project Manager: | Herrio Lamothe![]() |
Estimated Total Contract Cost: | $6,913,567.34 |
Estimated Total Federal Participating Construction Cost: | $6,269,240.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | 25% Package Received (as of 03/10/2025 ) |
|