Project Description:
NORFOLK- WRENTHAM- WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) (DESIGN ONLY)
The proposed project will construct a 12' shared use path to begin at Depot Street in Wrentham and end at the Lorusso Athletic complex in Walpole. Beginning at Depot St an underpass/culvert at Route 140 is anticipated utilizing the prior route of the railroad under 140. The path will then continue through private parcels and a state owned property with sections on elevated boardwalk through wetland areas prior to continuing through the Rice Recreation Area. The path will then continue through a state owned parcel (Wrentham Developmental Center) to the Norfolk Town line before advancing as a sidepath along Shire Drive and Route 1A in Norfolk then along Route 1A and Cushing Drive in Wrentham. Roadway and drainage improvements to Shire Drive and Cushing Drive may be required. From Cushing Drive the path will continue through private properties to the Norfolk Town Line and then along the abandoned railroad right of way which is privately owned in Norfolk until reaching the Walpole town line and ending at the Lorusso Athletic Complex. In Norfolk a bridge over Route 115 is anticipated and at grade crossing at Hill St is proposed. Proposed path is new construction and accordingly is expected to be full depth construction. Road work is anticipated at the roadway crossings. Existing rail corridor is not in service/abandoned.
Location:
  • Town of Norfolk
  • Town of Walpole
  • Town of Wrentham
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Barbara Lachance
    Estimated Total Contract Cost: $19,110,000.00
    Estimated Total Federal Participating Construction Cost: $19,754,350.00
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/20/2023
    Project Need Form PNF Approved 11/09/2023
    Project Initiation Form PIF Entered 11/20/2023
    Project Initiation Form PIF Approved 11/20/2023
    Project Initiation Form PRC Submitted 11/21/2023
    Project Review Committee PRC Approved 12/14/2023