Project Description: |
WATERTOWN- BRIDGE PRESERVATION, W-10-003, STATE ROUTE 16/GALEN STREET OVER CHARLES RIVER
This project will consist of arch repair work at the Galen Street bridge over the Charles River, in the town of Watertown.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2027 |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $1,862,069.94 |
Estimated Total Federal Participating Construction Cost: | $2,000,000.00 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|