| Project Description: |
GREAT BARRINGTON- CULVERT REPLACEMENT, ROUTE 23 OVER HUBBARD BROOK
The purpose of this project is to completely replace the culvert and reconstruct the approach roadways.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ryan P. Wilcox![]() |
| Estimated Total Contract Cost: | $3,151,000.00 |
| Estimated Total Federal Participating Construction Cost: | $3,439,420.00 |
| District: | District 1 |
| Current Status: | The Contract Scope of Work has been sent to the Design Engineer for consideration (as of 06/03/2024 ) |
|